Model of HMS Victory
Page 2.
|
|
|
|
|
![]() The model with Beakhead doors set open and Upper Deck Canons in place for effect September, 2016 |
![]() The model's Upper Starboard Deck Canons awaiting Breech Ropes, September, 2016 |
![]() The model's Waist with Canons for effect awaiting Breech Ropes , September, 2016 |
![]() The Beakhead doors set open, note Canons with Breech Ropes fitted, October, 2016, |
![]() The model with Upper Deck guns finished and pinned in place, October, 2016 |
![]() Upper Deck gratings with Canon Balls glued in place around the edges. This was how the shot was stored ready for battle. Canons with breech ropes October ,2016 |
|
|
![]() Foredeck showing carronades and spare cannon in place, also temporary placed Gangboards (Marines Walk) from Beakhead to Bowsprit. July 2017 |
|
![]() Foredeck showing Belfry, Waist and Hammock Cranes and one of the ship's boats, August ,2017 |
![]() Foredeck completed, August, 2017 |
|
|
Model's Poop Deck, October, 2017 |
![]() Model's Anchors awaiting connection and installation, June, 2018 |
![]() Model's Port Side Anchor with Cable attached, July, 2018. |
|
![]() Model's Port Side Anchors 30 July 2018 |